Skip to content
Clear Shield Roofers logo
Roofers in navy workwear setting new gray shingles on a freshly decked roof of a stucco home in Los Angeles

New Roof Installation in Los Angeles, CA

New roof installation in Los Angeles covers a full replacement on an existing house, a roof for an addition or ADU and a first covering on new construction. The material, slope, underlayment and flashing details are settled before anything is ordered, and the price is put in writing after we have seen the site.

  • ★ 4.9 on Google · 69 reviews
  • Same-day or next-day bookings
  • Based in Van Nuys, CA
On this page
  1. What does a new roof installation in Los Angeles include?
  2. When does a Los Angeles property need a new roof installation?
  3. Which roofing material fits a new roof in Los Angeles?
  4. ADU roof installation and new construction roofing
  5. How a new roof installation goes, step by step
  6. What affects new roof cost in Los Angeles?
  7. Permits, layers and cool roof rules for a new roof
  8. Why Clear Shield for a new roof installation in Los Angeles
  9. Common questions

If you are comparing a roofing contractor in Los Angeles for new roof installation, start with what kind of job it is. A tear-off on a 1960s house, a roof for a backyard ADU and a first covering on a new build share materials, but the sequence, the permit path and the pitfalls differ.

What does a new roof installation in Los Angeles include?

A full installation is more than shingles on a deck. It starts when the old roof comes off or, on new construction, when the framer hands over a bare deck, and it ends when the last nail is swept off the driveway. Every quote should say which of these lines it contains, because a price that skips one is not a lower price for the same job.

  • Tear-off or deck prep: old layers removed and the layer count stated, or a new deck inspected
  • Decking repair: soft or damaged boards priced per sheet before they are replaced
  • Underlayment and drip edge: the water barrier and the metal along the eaves and rakes
  • Flashing: walls, chimneys, skylights, vents and valleys, each detailed
  • The covering and ridge: the chosen material, ridge cap and ridge or attic vents
  • Cleanup and close-out: debris hauled, nails swept and the inspection or paperwork finished

Anything outside that list, such as gutters, fascia or solar detach and reset, should appear as its own line.

When does a Los Angeles property need a new roof installation?

Four situations account for most calls:

  • A worn-out roof: shingles at or past rated life, repeated leaks or failing decking. See roof replacement.
  • An addition: new rooms or a raised roofline that must be tied into the old one.
  • An ADU or guest house: a detached unit that needs its own covering.
  • New construction: a framed building with no roofing at all.

For a roof with life left, roof repair may do. Our roof inspection service helps you find out before you spend.

Bare plywood roof deck being covered with rolled synthetic underlayment on a Los Angeles home

Which roofing material fits a new roof in Los Angeles?

Material choice affects weight, fire rating, heat and price for decades. These are the four we explain most.

Material Fits best Trade-off
Asphalt shingle Pitched roofs, standard framing, a wide range of looks Shorter life in strong Valley sun
Concrete or clay tile Spanish and Mediterranean styles, long service life Weight, and the underlayment may age first
Standing seam metal Modern and ranch styles, low maintenance Higher price, noise and dents if poorly installed
Low-slope membrane ADUs, garages, porches, flat sections Seams and drains need regular checks

One reviewer says we talked through standing seam against asphalt shingle. Read more on asphalt shingle roofing, tile roofing and standing seam metal roofing.

Sizing, slope and detail decisions before we order

Good installation is mostly decided on the ground. The pitch sets which coverings are allowed and how water behaves. The deck, whether plywood or old spaced boards, sets how fasteners hold. Underlayment, drip edge and flashing at walls, chimneys and skylights decide whether the roof stays dry in a hard storm.

We also check the attic. Poor ventilation cooks shingles from below, and one reviewer describes a poorly placed vent found during a job. Ridge vents, intake at the eaves and the number of penetrations all get planned now, so nothing is cut in later.

Newly framed backyard ADU with open roof rafters behind a Southern California stucco house

ADU roof installation and new construction roofing

An ADU roof has to work with the main house, the lot and the permit set for the unit. Many have low pitches, so the covering may differ from the house roof even when they sit a few feet apart. On new construction, the framer, the roofer and the building inspector all need to agree on the deck before covering goes on.

Bring us your plans and we will tell you what each covering would require, from the deck up. If an ADU is in your future, read roofing an ADU in Los Angeles.

How a new roof installation goes, step by step

  1. Site visit. We photograph and measure the roof or review your plans.
  2. Choices. You see samples and trade-offs, and settle on material and color.
  3. Written price. It lists covering, underlayment, flashing, decking allowance and cleanup.
  4. Permit and ordering. The contract should name who pulls the permit before materials are ordered.
  5. Install. Old roofing comes off, the deck is checked and the new roof goes on in sections, each one dried in.
  6. Final sweep. Daily cleanup, a pass with a magnetic roller for nails and a closing walk with you.
Concrete tile, asphalt shingle and standing seam metal panel samples laid side by side on a driveway

Request a Quote

Prefer to talk? Call (209) 563-1278. For an active leak or storm damage, calling is fastest.

What affects new roof cost in Los Angeles?

Angi's Los Angeles figures for a replacement run roughly $4 to $12 per square foot, averaging about $8.60 (accessed November 2026). At that average, a typical 1,700 square foot home lands near $17,200. A new ADU roof is smaller, so the total is lower, though small roofs often cost more per foot.

The bigger levers are material, pitch, roof shape and the work hidden under the old roof. Skylights, chimneys and valleys add flashing. Steep or tall roofs slow work down. Removing a second layer, or replacing wet decking, adds both labor and material. Our written price follows a look at the site.

Warranties belong in the price talk. Ask what the manufacturer covers, what the installer covers, how long and whether either needs to be registered. Get terms on paper, and read the exclusions.

Permits, layers and cool roof rules for a new roof

A new roof generally needs a permit or, for eligible single-family homes in the City of Los Angeles, a certificate of compliance. Other cities and unincorporated areas have their own offices. Our page on roof permits lists who handles what.

California's residential code does not allow a new roof over one with two applications already. Replacements covering more than half the roof must use a cool-roof-rated product, with rules that depend on slope and climate zone, so look up your zone on the California Energy Commission site. Homes in fire hazard zones may need a Class A assembly.

Finished ridge cap and vent line on a new shingle roof against a clear Los Angeles sky

Why Clear Shield for a new roof installation in Los Angeles

Reviewers describe the habits we want on every new roof. One customer says we took care of the permit process, another received drone photos during the work, and another saw a second pass with a magnetic roller for missed nails. One Van Nuys homeowner describes an old shingle roof replaced and being very happy with the result, and another mentions pictures and measurements before the price.

We write down the scope before work starts, name the material and color, and price soft decking before it is replaced. For an ADU or an addition, that includes how the new roof drains and where it joins the old one. A written estimate and a clear sequence let you compare us with any other bid on the same lines.

What Van Nuys customers say about new roof installations

“I recently had my old shingle roof replaced with a new CertainTeed Pro line roofing system, and I am very happy with the results.”
Deborah B. · Google review, 4 months ago as of November 2026
“We were deciding between a standing seam metal roof and asphalt shingles, and frederick was a great guide who helped us understand the pros and cons so we could make the best choice for our home and budget.”
Patrick O. · Google review, 2 weeks ago as of November 2026
“They also took care of the permit process, which made everything much easier for me.”
Terrence M. · Google review, 4 months ago as of November 2026

4.9 on Google · 69 reviews as of November 2026. Read all reviews

We cover Burbank, Culver City, Hidden Hills, where homeowner association rules can govern roof materials, and La Cañada Flintridge. After install, a yearly roof maintenance visit keeps small gaps from becoming leaks.

New Roof Installation: common questions

How long does a new roof installation take in Los Angeles?

A typical house roof is a matter of days once materials arrive, and a simple one can be done in a day or two. Tile, steep pitches, rotted decking and extra flashing add time. Weather matters too, since we stop when rain threatens. We give you a schedule after seeing the roof and tell you if it changes.

Can you roof a new ADU or home addition?

Yes. We look at the framing plan, roof slope and how the new roof meets the old one, because that joint is where most leaks start on additions. An ADU on its own often has a low pitch that suits a different system than the house. We price the ADU roof by itself or together with the house roof.

Which roofing materials work best on new construction here?

Asphalt shingle, tile, standing seam metal and low-slope membranes all work, and the right pick depends on slope, weight, fire zone and the look of the house. New builds often need a Class A assembly and cool-roof-rated products. We bring samples, explain the trade-offs and let you decide before anything is ordered.

Can a new roof be installed in the Los Angeles rainy season?

Yes, with planning. Most of the rain falls from December through March, but it comes in storms with dry stretches between. One customer in Van Nuys describes skylights replaced even with light showers that morning, and another had a small leak fixed on a Sunday after rain during the job. We stage the roof so each section is dried in before we stop.

Do I need to be home during a new roof installation?

Not for the work itself, though it helps to be reachable for decisions such as soft decking found at tear-off. You should be present for the first walkthrough and the final check. Reviewers mention drone photos sent while the work was under way, which is useful if you would rather not climb up there.

What should be in writing before a new roof installation starts?

The covering and underlayment by type, the scope of decking repair, who pulls the permit, cleanup and the payment schedule. State law caps a home-improvement down payment at $1,000 or 10% of the contract price, whichever is less. Get manufacturer and workmanship warranty terms on paper too, with who stands behind each.

Areas served for new roof installation

Need new roof installation?

Call and tell us what you are seeing on the roof. We will take it from there.

Clear Shield Roofers
14526 Sherman Cir, Van Nuys, CA 91405
(209) 563-1278
Call (209) 563-1278
Call (209) 563-1278